Mini-hydropower plant “Planska”

Mini-hydropower plant “Planska”

Execution of rough and final construction works on the construction of a machine-building within the system of a mini-hydropower plant on the Planska River. The works were carried out under special conditions, by diverting the river flow by making mudslides and by constantly lowering the groundwater level, to create the foundations of the building. Constructive has successfully performed all works that include concrete, reinforcement, masonry, locksmith, tinsmith, painting and facade works.

Project Description

Client: ZP-DREN doo Raška
Location: Jošanička banja
Year Completed: 2017.