Hydro construction

Rain channel reconstruction

In the settlement of Radujevac in Negotin, the overflow of atmospheric water from the existing open rain channel was a major problem. Reconstruction first deepened and widened the existing channel first, and then the trapezoidal trough was reinforced and concreted, leaving an opening in the slope. Tubular culverts were made at the crossings for cars and pedestrians with the installation of AB pipe Ø1000.

RESERVOIR “GLOGONJ”

Izgradnja rezervoara "Glogonj" zapremine V=500 m3 , u sklopu magistralnog vodovoda za
vodosnabdevanje severnog dela grada Pančeva. Rezervoar je gabarita 10x18m visine 7m. Konstruktiva je
uspešno izvela sve radove na izgradnji koji obuhvataju zemljane, armirano-betonske, armiračke,
hidroizolaterske, bravarske i ostale radove.

TANK „RAZBOJIŠTE“

Ovaj rezervoar je projektovan kao ukopan rezervoar i sastoji se od dve identične komore zapremina od po 250 m3, koje poseduju zajedničku zatvaračnicu...

TANK „BOJNIK“

Rezervoar ,,Bojnik" lociran je neposredno ispod postrojenja za prečišćavanje vode za piće na levoj obali Puste reke, iznad aerodroma u Bojniku. Rezervoar poseduje dve komore zapremine po 500m3...